Sunshine Coast, BC
HDPE hot tubs for Gibsons Landing, Upper Gibsons, and Roberts Creek. Lifetime warranty, delivery scheduled around the ferry, no electrician or concrete pad.
Built for Gibsons
Gibsons runs on boat time and ferry time, and a lot of what people love about it, the harbour, the marina, the view down onto Gibsons Landing, comes with salt air and a damp coastal climate that is hard on ordinary hot tub materials.
The HDPE shell is a single moulded piece with nothing to peel, rust, or absorb moisture. It handles wet Sunshine Coast winters and the humidity off the harbour the same way it handles everything else, by not reacting to it.
Whether you are in Upper Gibsons on a view lot, down near Molly's Reach and the government wharf, or out toward Roberts Creek, the tub goes wherever you have a level surface. No concrete pad and no crane means you are not waiting on a contractor's schedule that also runs on ferry time.
Delivery Coverage
We deliver to Gibsons and the lower Sunshine Coast from our Abbotsford showroom. Because getting here means a ferry crossing, we schedule delivery around the sailing schedule and confirm the date, the reservation, and your access details before your deposit goes down.
Gibsons Landing, Upper Gibsons, Hopkins Landing
Roberts Creek, Elphinstone, Granthams Landing
Sechelt, Selma Park, Wilson Creek
8 Models Available
From the compact E1 for a smaller deck to the full-size E6 Deluxe for a big lake property. Every model features the same unbreakable HDPE shell, lifetime hard cover, and plug-and-play installation.
2-4 seats · 12 jets
From $11,999
2 seats · 21 jets
From $12,999
2-3 seats · 23 jets
From $14,799
3-4 seats · 21+ jets
From $14,999
2 seats · 21+ jets
From $15,499
6-7 seats · 21 jets
From $17,999
6-7 seats · 34 jets
From $19,999
Not Your Average Hot Tub
One-piece, non-porous construction. Won't crack, fade, or harbour bacteria. How HDPE resists bacteria
R-40, 350lb load rating, never needs replacing. See the lifetime hard cover
3,000x faster-acting than chlorine. 90% fewer chemicals. How the Ecozone system works
No electrician, no concrete pad, no contractor. Usually running within a day or two of delivery. Installation details
Visit Us
Gibsons is served from our Abbotsford showroom. If you are making the trip over on the ferry anyway, seeing the models and covers in person before you order is worth the drive. Otherwise, send us photos of your spot and we quote it remotely.
See every model in person. Touch the HDPE shell. Lift the hard cover. No appointment necessary, but booking ahead means we can have the models you want to see ready for you.
Ready?
Delivered to your door. Usually running within a day or two of delivery. Warrantied for life.
Also Serving
Local Notes
Most Gibsons properties fall into one of two camps: a sloped view lot in Upper Gibsons or Hopkins Landing, or a flatter lot closer to the water down in Gibsons Landing. Either way, the question that actually matters is where the tub sits and whether that spot is level, not what kind of foundation it needs. An Eco Spa spreads its weight across a one-piece base, so a deck, a paver pad, or compacted gravel all work without pouring anything first.
The other thing to plan around here is the ferry. Since delivery comes over on the Langdale run, we build your delivery date around sailing times rather than promising a fixed number of days. Tell us your access, whether it is a driveway off a hillside road or a flatter approach near the water, and we will work the crossing and the placement into one confirmed plan before you put down a deposit.
Yes. We schedule delivery around the Langdale ferry sailing and confirm the date, the crossing, and your access details before your deposit is due, so there is no guessing about timing.
Often, yes, as long as there is one level spot to set it on. The one-piece base does not need a poured pad, so a built deck or a levelled gravel area on a hillside lot both work. Send us photos and we will tell you honestly if the spot needs any prep first.
Not much. The HDPE shell does not absorb moisture or corrode the way metal fittings and porous shells can, so salt air off the harbour is not something you need to plan around.